One of the earlier Omnia Bridge Deck Units in use is that forming part of the Bridlington integrated transport plan. PBS Construction from Hull was awarded the contract to construct the road bridge now in use over the Gypsey Race at Beck Hill. Omnia Bridge Deck Units were used in the design of the bridge deck and Winn & Coales (Denso) supplied Densostrip™ and Densostrip Primer™ to seal between the supporting steel beams and the Omnia Bridge deck planks. Denso Primer D™ and Densopol 60™ Tape were then used to seal the joints between the precast concrete planks. The use of these materials prevented any grout loss when the in-situ concrete was poured to form the bridge deck.
t: 0208 670 7511 | e: mail@denso.net | www.denso.net